Factory and plant equipment manufacturing case study: Gas blower casing
We have handled the production of the blower! We conducted a mock assembly and carried out a leak test.
We would like to introduce a case study of the "Gas Blower Casing" from the many achievements of Kōki Sangyō Co., Ltd. We handled the manufacturing of the blower, conducted a mock assembly, and performed a leak test. At Kōki Sangyō, we design various plants, machinery, and equipment. We propose cost reductions through measures such as preventing errors with 3D modeling and automatic drafting of working drawings. 【Case Overview】 ■ Request: Gas Blower Casing ■ Delivery Destination: Baosteel *For more details, please refer to the PDF document or feel free to contact us.
- Company:鋼機産業
- Price:Other